Reference Project: 2,000 Cans/Hour Full-Auto Line

Reference Project — Sample Configuration

Full-Auto Production Line

Production Scale · 2,000 cph · Fully Automatic

⚠️ Transparency Note: This is not a customer case study. It is a reference configuration based on common industry requirements. Budgets are estimated for equipment only and do not include raw materials, shipping, or facility construction. Actual pricing depends on your specific product, output, and can specifications.

Target Customer

Growing manufacturers ready to scale from semi-automatic to full automation. Ideal for companies with consistent product runs exceeding 10,000 cans per day, or exporters requiring documented production traceability.

Equipment Configuration

Model Equipment Why This Choice
FD9801 Full-Auto 1-Inch Line (Entry Level) Complete conveyor-based system: can unscrambler, 2-head liquid filler, sealing machine, 2-head gas filler with 2 booster pumps, explosion-proof motor, packing table.
FD9951 Automatic Valve Inserter Rotary disc selects and orients aluminum valves, pneumatic delivery to insertion station.
FD9955 Automatic Hot Water Bath In-line leak testing with suspended chain conveyor. Explosion-proof drive.
FD9954 Automatic Checkweigher Per-can weighing. Siemens + Festo. Digital per-shift production statistics.
FD9958 Gripper Conveyor + Inkjet Coder Dual-belt synchronized gripper transport. No can rotation — stable coding. Explosion-proof motor.
FD9956 Automatic Actuator Placer Vibrating hopper + pneumatic press. Synchronized with line speed.
FD9957 Automatic Cap Placer PLC-controlled sorting and pressing. Low noise operation.

Production Process

1. Can Unscrambling Automatic unscrambler orients and feeds empty cans onto conveyor
2. Liquid Filling 2-head automatic filler dispenses concentrate into cans passing on conveyor — synchronized timing
3. Valve Insertion FD9951 automatically places aluminum valves into filled cans
4. Valve Sealing Automatic sealing station crimps valves as cans pass through
5. Propellant Gassing 2-head gas filler with dedicated booster pumps injects propellant. Separate gas room for safety.
6. Hot Water Bath FD9955 in-line water bath: cans travel through 55-65°C water on suspended chain. Visual leak inspection through windows.
7. Checkweighing FD9954 weighs each can. Rejects auto-separated. Per-shift statistics logged.
8. Coding FD9958 gripper conveyor transports cans to inkjet coder — no can rotation, clean print
9. Actuator + Cap FD9956 places spray head, FD9957 places overcap — both synchronized automatically
10. Packaging Carton packing and palletizing station

Estimated Budget

FD9801 Core Line $80,000 – $110,000
Auxiliary Equipment Package $25,000 – $40,000
Installation & Commissioning $8,000 – $15,000
Remote Support (available) $5,000 – $10,000
Total Investment $118,000 – $175,000

Facility Requirements

150-250 m² total. Production line: ~100 m². Dedicated gas room: ~15 m². Raw materials: ~40 m². QC lab: ~20 m². Finished goods: ~40 m². 3-phase power required. Compressed air system: 10+ bar.

Operators: 2-3 workers for line operation + 1 QC inspector + material handlers. Total: 4-6 staff.

💡 Why This Configuration

This is the natural upgrade path from semi-automatic. The FD9801 line produces 15,000-20,000 cans per 8-hour shift — roughly 3x what a semi-auto setup achieves with the same labor. The full auxiliary equipment package (valve inserter, water bath, checkweigher, coders, placers) makes this a turnkey production solution.

Want a Customized Configuration for Your Product?

These are reference configurations based on common requirements. Every production line is different — tell us your product type, target output, can dimensions, and budget, and we’ll design a tailored solution.

Request Custom Quote →
Equipment Selection Guide →